3 ● Run a Job
3-10
SV63176 RevB
Job 5
• Two Folded Sheets
• Into One Envelope
•
Configuration required: Relay 1000
with optional Sheet Feeder A2
NOTE
: Run the address-bearing document from Sheet Feeder A2 and a
second sheet that needs folding from Sheet Feeder A1.
STEP
ACTION
TIP
1
Make sure the paper size
setting is correct.
NOTE:
This setting is not
available on all models.
Select
11”
or
14”
.
2
Load addressed sheets into
Sheet Feeder A2.
Load face down and bottom
edge first.
3
Load second sheets into
Sheet Feeder A1.
Load face down and bottom
edge first.
4
Load envelopes in Feeder B.
Load right way up and facing
you.
5
Press button to select
Feeder
A1 and A2
.
Make sure BOTH green
indicators are lit.
6
Press button to select
Envelope Fdr B
.
Make sure indicators are green.
7
Press button to choose
Seal
or
No Seal
.
Make sure moistener has E-Z
Seal® or water.
8
Press the
Trial Piece
button
and inspect trial piece.
Trial piece will not seal- this is
normal.
9
Press the
Start
button to run
job.
The
Stop
button will stop the
system at the end of the cycle.
Summary of Contents for Relay 1000
Page 8: ...This page is intentionally blank ...
Page 18: ...This page is intentionally blank ...
Page 26: ...This page is intentionally blank ...
Page 41: ...4 1 4 Clear Material Contents Clear Material Jams 4 3 ...
Page 42: ...This page is intentionally blank ...
Page 44: ...This page is intentionally blank ...
Page 46: ...This page is intentionally blank ...
Page 54: ...This page is intentionally blank ...
Page 56: ...This page is intentionally blank ...