
2 • System Setup
2-4
SV63176 RevB
Fill the Moistener
The oval window on the front of the
moistener provides an easy view of
the current fluid level. When the fluid
gets low, refill the moistener.
1. Slide the moistener out to the
right.
IMPORTANT!
Never open the moistener
while the system is processing material.
2. Carefully fill the moistener with
E-Z Seal
®
solution or water up to
the “Max” mark in the filler funnel.
We recommend E-Z Seal
®
to
minimize algae growth and scale
buildup.
3. Slide the moistener back into the system. From a dry state, the
moistener takes about five minutes to become fully wet and ready for
use.
Summary of Contents for Relay 1000
Page 8: ...This page is intentionally blank ...
Page 18: ...This page is intentionally blank ...
Page 26: ...This page is intentionally blank ...
Page 41: ...4 1 4 Clear Material Contents Clear Material Jams 4 3 ...
Page 42: ...This page is intentionally blank ...
Page 44: ...This page is intentionally blank ...
Page 46: ...This page is intentionally blank ...
Page 54: ...This page is intentionally blank ...
Page 56: ...This page is intentionally blank ...