
3 ● Run a Job
3-6
SV63176 RevB
Job 1
• One folded sheet
• Into an envelope
•
Configuration required: any Relay 1000
NOTE
: If your system has the optional 2nd sheet feeder A2, you can use
it instead of A1, as long as you load and select it as described in steps 1
and 3 below.
STEP
ACTION
TIP
1
Make sure the paper size
setting is correct.
NOTE:
This setting is not
available on all models.
Select
11”
or
14”
.
2
Load sheets into Sheet
Feeder A1.
Load face down and bottom
edge first.
3
Load envelopes in Feeder B.
Load right way up and facing
you.
4
Press button to select
Feeder
A1
.
Make sure indicators are green.
5
Press button to select
Envelope Fdr B
.
Make sure indicators are green.
6
Press button to choose
Seal
or
No Seal
.
Make sure moistener has E-Z
Seal® or water.
7
Press
Trial Piece
button and
inspect trial piece.
Trial piece will not seal - this is
normal.
8
Press the
Start
button to run
the job.
The
Stop
button will stop the
system at the end of the cycle.
Summary of Contents for Relay 1000
Page 8: ...This page is intentionally blank ...
Page 18: ...This page is intentionally blank ...
Page 26: ...This page is intentionally blank ...
Page 41: ...4 1 4 Clear Material Contents Clear Material Jams 4 3 ...
Page 42: ...This page is intentionally blank ...
Page 44: ...This page is intentionally blank ...
Page 46: ...This page is intentionally blank ...
Page 54: ...This page is intentionally blank ...
Page 56: ...This page is intentionally blank ...