Run a Job ● 3
3-9
SV63176 RevB
Job 4
• One insert
• Into an envelope
•
Configuration required: Relay 1000 with
Insert Feeder C
NOTE
: Inserts are pre-folded sheets or unfolded items such as business
reply envelopes, response cards and similar materials.
STEP
ACTION
TIP
1
Load envelopes into Feeder
B.
Load right way up and facing
you.
2
Load inserts into Insert
Feeder C.
Loading orientation depends on
the item.
3
Press button to select
Envelope Fdr B
and
Insert
Fdr C
.
Make sure BOTH green
indicators are lit.
4
Press
A1/A2
select button
until both feeders and
2nd
Page
are turned
OFF
.
Make sure NO indicators lights
are lit for A1 or A2 or 2nd page.
5
Press button to choose
Seal
or
No Seal
.
Make sure moistener has E-Z
Seal® or water.
6
Press the
Trial Piece
button
and inspect trial piece.
Trial piece will not seal - this is
normal.
7
Press the
Start
button to run
job.
The
Stop
button will stop the
system at the end of the cycle.
Summary of Contents for Relay 1000
Page 8: ...This page is intentionally blank ...
Page 18: ...This page is intentionally blank ...
Page 26: ...This page is intentionally blank ...
Page 41: ...4 1 4 Clear Material Contents Clear Material Jams 4 3 ...
Page 42: ...This page is intentionally blank ...
Page 44: ...This page is intentionally blank ...
Page 46: ...This page is intentionally blank ...
Page 54: ...This page is intentionally blank ...
Page 56: ...This page is intentionally blank ...