List of figures
Fig. 1:
Position of the stickers on the product
Fig. 2:
Product overview with combination examples
Fig. 3:
DCU control panel
Fig. 4:
DCU with integrated power supply pack, rear view
Fig. 5:
Overview: Turbo and backing pump combinations
Fig. 6:
Transport turbo pumping station
Fig. 7:
Fix pumping station with lashing straps
Fig. 8:
Flange connection ISO-KF to ISO-KF
Fig. 9:
Flange connection ISO-K to ISO-F, bracket screws
Fig. 10:
Flange connection CF-F, hexagon head screw and through hole
Fig. 11:
Flange connection CF-F, stud screw and tapped hole
Fig. 12:
Flange connection CF-F, stud screw and through hole
Fig. 13:
Example backing pump exhaust connection
Fig. 14:
Backing pump transportation lock
Fig. 15:
Fill operating fluid
Fig. 16:
Example of accessory connection via adapter TCS 12
Fig. 17:
Grounding cable
Fig. 18:
Power supply connector and main switch on HiCube Pro
Fig. 19:
Electrical connections
Fig. 20:
Connections to the turbo pump
Fig. 21:
Dismantling the turbopump
Fig. 22:
Operating fluid change with rotary vane pump as backing pump
Fig. 23:
Dimensions HiCube Pro
List of figures
6/80