User
Manual
Bed
‐
GK
1+2e
Rev.
03.04.2019
Page
93
/
143
11.3
Graphic
map
selection
You
have
the
option
to
select
from
as
many
as
10
different
Graphics,
or
10
different
areas.
To
do
this,
right
‐
click
in
the
graphic.
The
selection
window
will
open.
Now
select
the
graphic
or
area
that
you
want.
Should
the
graphic
be
larger
than
the
screen
you
can
move
the
graphic
up
and
down
or
sideways
using
the
scroll
bars
on
the
right
and
at
the
bottom
edge
of
the
screen.
You
can
now
open
a
valve
by
clicking
the
valve
symbol.
Enter
the
valve
open
time
from
1
‐
99
minutes.
The
default
value
is
15
minutes.
Click
OK
to
open
the
valve
selected.
11.4
Pump
management
The
system
will
then
start
a
pump
(pumps)
with
the
required
capacity.
Example:
2
pumps
are
installed
Pump
1:
20
m³/h
Pump
2:
10
m³/h
3
Valves
are
opened
Valve
1:
5
m³/h
Valve
2:
5
m³/h
Valve
3:
8
m³/h
Execution:
1.
Valve
1
opens
(5m³/h)
The
system
starts
Pump
2
(10
m³/h)
2.
Valve
2
opens
(5
m³/h)
The
system
does
not
start
another
pump
as
the
capacity
of
Pump
2
(10
m³/h)
is
sufficient.
3.
Valve
3
opens
(8
m³/h)
The
system
starts
a
boost
pump
–
Pump
2
(20
m³/h)
–
and
switches
pump
1
off
after
the
next
interval
time
(see
chapter
7)
Summary of Contents for Greenkeeper Feedback
Page 54: ...User Manual Bed GK 1 2e Rev 03 04 2019 Page 54 143 7 9 Wiring Schematic for VCU...
Page 123: ...User Manual Bed GK 1 2e Rev 03 04 2019 Page 123 143 VCU...
Page 134: ...User Manual Bed GK 1 2e Rev 03 04 2019 Page 134 143 15 1 5 FB Decoder Indication Light...
Page 136: ...User Manual Bed GK 1 2e Rev 03 04 2019 Page 136 143...
Page 141: ...User Manual Bed GK 1 2e Rev 03 04 2019 Page 141 143...