26 . Peltier Temperature Programmer User’s Guide
2.
Remove the covers.
The covers must be refitted when the alignment procedure has been completed.
3.
Follow the instructions provided with the changer unit to install the cell holders.
The side that the flat cable will be connected to must be placed towards the rear wall of
the sample compartment. This means the flat cable connector is at the back, and the
water flow connectors are at the front.
4.
Fix one end of one flat cable to the six cell sample holder, and then feed the cable
through the slot at the rear of the sample compartment to the bottom of the
spectrometer.
5.
Fix one end of the other flat cable to the six cell reference holder, and then feed the
cable through the slot at the rear of the sample compartment to the bottom of the
spectrometer.
6.
Install the unit in the sample compartment, according to the instructions.
Take care to avoid badly crimping the flat cables. Allow sufficient cable for the cell
holders to move in the changer unit but do not obstruct the light path.
7.
Connect the cables you have fed through the bottom of the spectrometer to the
Sample
and
Reference
sockets on the rear of the control unit (Figure 4).
Connecting a Computer
¾
Connect the RS232 serial cable provided between the electronic control unit and a PC
running Templab software (L6100044).
NOTE:
Templab requires UV WinLab v2.85.
Summary of Contents for PTP-1
Page 1: ...Peltier Temperature Programmer User s Guide...
Page 5: ...Introduction...
Page 10: ...10 Peltier Temperature Programmer User s Guide...
Page 11: ...Warnings and Safety Information...
Page 18: ...18 Peltier Temperature Programmer User s Guide...
Page 19: ...Installation...
Page 30: ...30 Peltier Temperature Programmer User s Guide...
Page 31: ...Description...
Page 36: ...36 Peltier Temperature Programmer User s Guide...
Page 37: ...Operation...
Page 47: ...Configuration and Maintenance...