![Peri MO-20-00445 0 Assembly, Commissioning And Maintenance Instructions Download Page 57](http://html1.mh-extra.com/html/peri/mo-20-00445-0/mo-20-00445-0_assembly-commissioning-and-maintenance-instructions_1529932057.webp)
57
RCS-2 Climbing Device and Hydraulics
Assembly Instructions
D7 Remedial measures for malfunc-
tions
Extending the cylinders to the
same height
Unequal ballasting on the climbing units
can result in a lateral offset. In rare cases,
this could negatively affect the “insert-
ing” of the RCS Rails in the next climbing
shoe. This deviation can be corrected
even if the pistons have not been com-
pletely extended.
1. Press the “Operation Mode” button
(
3.17
), until the button flashes orange.
→
Single-mode operation is activated.
2. Select the climbing device using the
“Cylinder 2 On/Off” button (
3.20
) and
“Cylinder 1 On/Off” (
3.22
) button.
→
The selected cylinder lights up or-
ange.
2. Extend the climbing device to the same
height by:
– pressing the “Cylinder Extend” but-
ton on the keypad.
or
– pressing the “Cylinder Extend” but-
ton on the connected remote control.
4. Press the “Operation Mode” button
(
3.17
), until the button lights up green.
→
Interlink-mode operation is activated.
Fig. D7.03
3.17
3.20
3.22
Summary of Contents for MO-20-00445 0
Page 61: ...61 RCS 2 Climbing Device and Hydraulics Assembly Instructions ...
Page 79: ......