![Peri MO-20-00445 0 Assembly, Commissioning And Maintenance Instructions Download Page 46](http://html1.mh-extra.com/html/peri/mo-20-00445-0/mo-20-00445-0_assembly-commissioning-and-maintenance-instructions_1529932046.webp)
46
RCS-2 Climbing Device and Hydraulics
Assembly Instructions
D4 Climbing procedure
Inserting into the climbing shoe
at RCS CL
Observe Section D5 and the Instructions
for Assembly and Use for Rail Climbing
System RCS CL.
Standard case:
■
Before reaching the next climbing shoe
(
5A / 5B
), retract the climbing rail ex-
tension.
■
In the event of a lateral offset, extend
the cylinders to the same height.
Climbing platforms individually
1. Stop approx. 2 cm in front of the climb-
ing shoes (
5
).
2. Press the “Operation Mode” button
(
3.17
), until the button flashes orange.
→
Single-mode operation is activated.
3. Insert the climbing rail extensions indi-
vidually into the climbing shoes:
– pressing the “Cylinder Extend” but-
ton on the keypad.
or
– pressing the “Cylinder Extend” but-
ton on the connected remote control.
4. Press the “Operation Mode” button
(
3.17
), until the button lights up green.
→
Interlink-mode operation is activated.
Fig. D4.12
3.17
5A
5B
1.1
Fig. D4.11
Summary of Contents for MO-20-00445 0
Page 61: ...61 RCS 2 Climbing Device and Hydraulics Assembly Instructions ...
Page 79: ......