44
RCS-2 Climbing Device and Hydraulics
Assembly Instructions
D4 Climbing procedure
Inserting into the climbing shoe
at RCS C
Observe Section D5 and the Instructions
for Assembly and Use for Rail Climbing
System RCS C.
Before the last stroke:
Standard case:
Vertical bearing at the height of the
intermediate platform
■
Top climbing shoe (
5A
) is deactivated.
■
In order to allow for easier insertion into
the top climbing shoe, open both fold-
ing runners.
■
Middle climbing shoe (
5B
) is activated.
Alternatively:
Vertical bearing at the height of the
working platform
■
Top climbing shoe (
5A
) is activated.
■
Both folding runners are closed.
■
Middle climbing shoe (
5B
), on which
the climbing device is placed, is deacti-
vated during the last stroke.
Adjusting the climbing system
■
In order to allow for easier insertion, the
framework can be adjusted.
■
By turning the Framework Spindle (
19
),
the inclination of the top climbing rail
(
9A
) is adjusted relative to the bottom
climbing rail (
9B
).
■
In the event of a lateral offset, extend
the cylinders to the same height.
Fig. D4.08
Fig. D4.09
5A
9
5A
9A
5B
19
9B
Summary of Contents for MO-20-00445 0
Page 61: ...61 RCS 2 Climbing Device and Hydraulics Assembly Instructions ...
Page 79: ......