RCS-2 Climbing Device and Hydraulics
Assembly Instructions
D7 Remedial measures for malfunc-
tions
The flushing time required for each 20 m
single hose length is approx. 1 minute
(DN 08).
Venting during hose replacement
1. Detach old hose.
2. Connect new hose on the pump side.
3. Flush hoses using short-circuit connec-
tions.
4. Connect the cylinder in horizontal posi-
tion and extend fully.
5. Uncouple the cylinder and flush hoses
once again using short-circuit connec-
tions.
6. Connect the cylinder in horizontal posi-
tion and extend fully.
7. Uncouple the cylinder and flush hoses
once again using short-circuit connec-
tions.
8. Connect the cylinder and extend and re-
tract several times.
Extend and retract the cylinder several
times in order to check for leakage and
synchronisation. In the process, extend
and retract the cylinder at maximum pres-
sure for a longer time in the end positions.
Manual end position compensation
If the synchronisation deviation is too
great when under load, then carry out a
manual end position compensation with
the aid of a short-circuit connection.