![Peri MO-20-00445 0 Assembly, Commissioning And Maintenance Instructions Download Page 33](http://html1.mh-extra.com/html/peri/mo-20-00445-0/mo-20-00445-0_assembly-commissioning-and-maintenance-instructions_1529932033.webp)
33
RCS-2 Climbing Device and Hydraulics
Assembly Instructions
D2 Assembly of the hydraulic pump
Assembly on handrail boards
Alternatively, the hydraulic pump can be
fastened onto the guardrails.
Components
3
Hydraulic Pump RCS MAX
16
Bolt ISO 4017 M12 x 60-8.8
17
Washer ISO 7089 200 HV, A12
18
Nut ISO 4034 M12-8
Assembly
1. Bore holes in the designated positions
in the handrail boards.
2. Lift Hydraulic Pump RCS MAX (
3
) into
the mounting position.
3. Fasten Hydraulic Pump RCS MAX (
3
)
onto the upper handrail board with 4x
bolt ISO 4017 M12 x 60-8 (
16
), Washer
ISO 7089 200 HV, A12 (
17
) and Nut ISO
4034 M12-8 (
18
).
4. Fasten Hydraulic Pump RCS MAX (
3
)
onto the lower handrail board with 2x
bolt ISO 4017 M12 x 60-8 (
16
), Washer
ISO 7089 200 HV, A12 (
17
) and Nut ISO
4034 M12-8 (
18
).
(Fig. D2.02)
Fig. D2.02
16 + 17 + 18
3
Summary of Contents for MO-20-00445 0
Page 61: ...61 RCS 2 Climbing Device and Hydraulics Assembly Instructions ...
Page 79: ......