FOUNDATION Fieldbus Integration
2
02
0-
11
127
Importing Tags in General
1.
Launch the tag import wizard.
2.
In order to create a new topology, choose
Create a new topology
.
The wizard clears all tags saved on the DGW-FF.
3.
In order to update tags already loaded, choose
Update existing project topology
.
The wizard assigns imported tags to the currently existing tags based on the segment tag.