82
13.3 Assembly tools
See the latest Parker TFDE catalogue at
13.4 Safety instructions for assembly
Two-handed operation: Hold tube – keep Start button pressed down.
Operation by one person only!
Failure to comply may result in crushing injuries.
14 Maintenance, cleaning and repairs
The plug must always be removed from the mains before any maintenance
and repair work and secured from being reactivated.
14.1 Regular maintenance
•
Regular maintenance of the machine:
fitter’s shop at the operating site
•
Hydraulic components:
fitter’s shop at the operating site
•
Electrical circuit components Electrical
workshop at the operating site
Summary of Contents for Parflange 1025
Page 18: ...18 6 Konformit tserkl rung...
Page 59: ...59 Operating Instructions Original Operating Instructions Parflange 1025...
Page 76: ...69 6 Declaration of Conformity...
Page 118: ...111...