72
10 Inspections prior to initial start-up
The following points must be observed before the machine is started for the
first time and prior to its initial use in production:
Check the machine oil level and fill up with hydraulic oil if necessary
(see section 14.3.2 Maintenance). The hydraulic oil used should in all cases
be processed in a clean and filtered state.
Your machine has been filled with pin lubricating oil (LUBSS). We still
recommend checking the oil level using a ruler before using the machine for
the first time.
The capacity of the tank is 0.4 litres
Check that all required plugs are connected (electrical connections) and that
the plugs are securely in place.
Summary of Contents for Parflange 1025
Page 18: ...18 6 Konformit tserkl rung...
Page 59: ...59 Operating Instructions Original Operating Instructions Parflange 1025...
Page 76: ...69 6 Declaration of Conformity...
Page 118: ...111...