3. Configuration
9123-A2-GB20-20
August 2001
3-15
Setting Up Back-to-Back Operation
Using this special feature, you can set up two FrameSaver units that are
connected back-to-back without frame relay switches between them, as in a test
bench setup.
Changing Operating Mode
When setting up back-to-back operation:
One unit must be configured for Standard operation, which is the setting for
normal operation.
The other unit must be configured for Back-to-Back operation so it presents
the network side of the UNI (user-network interface).
Only one of the units will have its operating mode changed.
Procedure
To set up back-to-back operation:
1. On the unit to be configured for Back-to-Back operation, manually configure
DLCIs; DLCIs should be configured before connecting the two units.
2. Access the Change Operating Mode screen.
Main Menu
→
Control
→
Change Operating Mode
3. Select Back-to-Back Operation, and respond Yes to the
Are you sure?
prompt.
4. Save the change.
Procedure
To return the unit to normal operation:
1. Return to the Change Operating Mode screen and switch back to Standard
Operation.
2. Respond Yes to the prompt and save the change. The units can be
reconnected to a standard frame relay network.
Summary of Contents for FrameSaver FLEX 9123
Page 1: ...FrameSaver FLEX 9123 User s Guide Document No 9123 A2 GB20 20 August 2001 ...
Page 10: ...Contents viii August 2001 9123 A2 GB20 20 ...
Page 24: ...1 About the FrameSaver FLEX 9123 1 10 August 2001 9123 A2 GB20 20 ...
Page 34: ...2 User Interface and Basic Operation 2 10 August 2001 9123 A2 GB20 20 ...
Page 98: ...3 Configuration 3 64 August 2001 9123 A2 GB20 20 ...
Page 212: ...8 Setting Up NetScout Manager Plus for FrameSaver Devices 8 18 August 2001 9123 A2 GB20 20 ...
Page 228: ...A Menu Hierarchy A 6 August 2001 9123 A2 GB20 20 ...
Page 258: ...B SNMP MIBs and Traps and RMON Alarm Defaults B 30 August 2001 9123 A2 GB20 20 ...
Page 266: ...C Connectors Cables and Pin Assignments C 8 August 2001 9123 A2 GB20 20 ...