5. Operation and Maintenance
9123-A2-GB20-20
August 2001
5-21
EDLCI
0 to 62
For multiplexed DLCIs only.
Identifies an individual link/
connection embedded within a DLCI.
Status
Identifies whether the physical
interfaces, LMIs, and DLCIs are all
enabled and active for this PVC
connection.
Active*
The PVC is currently active.
Inactive
The PVC is inactive because:
– Alarm conditions and network
and SLV communication status
indicate that data cannot be
successfully passed.
– The unit has disabled the
interface or frame relay link
due to internal operating
conventions.
– Activation of an alternate
virtual circuit is not warranted;
that is, no alarm condition on
the primary destination link
has been detected.
Disabled
The PVC cannot be activated and
is essentially disabled as a result
of how the unit was configured.
Possible causes:
– The physical interface at one
or both ends of the PVC is/are
disabled.
– The frame relay link on one or
both ends of the PVC is/are
disabled.
Invalid
Some portion of the PVC
connection is not fully configured.
* For the circuit to be active, both Source and Destination Statuses must be Active.
Table 5-10. PVC Connection Status (2 of 2)
Field
Status
What It Indicates
Summary of Contents for FrameSaver FLEX 9123
Page 1: ...FrameSaver FLEX 9123 User s Guide Document No 9123 A2 GB20 20 August 2001 ...
Page 10: ...Contents viii August 2001 9123 A2 GB20 20 ...
Page 24: ...1 About the FrameSaver FLEX 9123 1 10 August 2001 9123 A2 GB20 20 ...
Page 34: ...2 User Interface and Basic Operation 2 10 August 2001 9123 A2 GB20 20 ...
Page 98: ...3 Configuration 3 64 August 2001 9123 A2 GB20 20 ...
Page 212: ...8 Setting Up NetScout Manager Plus for FrameSaver Devices 8 18 August 2001 9123 A2 GB20 20 ...
Page 228: ...A Menu Hierarchy A 6 August 2001 9123 A2 GB20 20 ...
Page 258: ...B SNMP MIBs and Traps and RMON Alarm Defaults B 30 August 2001 9123 A2 GB20 20 ...
Page 266: ...C Connectors Cables and Pin Assignments C 8 August 2001 9123 A2 GB20 20 ...