Monitoring and Testing
4-31
3166-A2-GB20-20
March 1999
6. When you are satisfied that all LEDs are lighting and the LCD is functioning
properly, abort the Lamp test from the Lamp Test screen. If there is no activity
on the DSU/CSU front panel for five minutes, the Device Health and Status
screen appears automatically. However, the Lamp test remains active until it
is aborted.
Aborting a Lamp Test
Procedure
To abort the Lamp test:
1. Display the Lamp Test screen. To do this when the LCD is alternating the
Lamp test screens, press any Function key. Otherwise, follow Steps 1
through 3 of
Starting a Lamp Test
on page 4-30.
F1
Lamp Test:
Abort
Start
F2
F3
2. From the Lamp Test screen, select Abort.
F1
Lamp Test:
Abort
Start
F2
F3
Summary of Contents for 3166 DSU
Page 1: ...ACCULINK 3166 DSU CSU USER S GUIDE Document No 3166 A2 GB20 20 March 1999...
Page 16: ...About This Guide x 3166 A2 GB20 20 March 1999 This page intentionally left blank...
Page 20: ...Introduction 1 4 3166 A2 GB20 20 March 1999 This page intentionally left blank...
Page 68: ...SDCP Operation 3 42 3166 A2 GB20 20 March 1999 This page intentionally left blank...
Page 102: ...SDCP Menu A 2 3166 A2 GB20 20 March 1999 This page intentionally left blank...
Page 140: ...Pin Assignments D 12 3166 A2 GB20 20 March 1999 This page intentionally left blank...
Page 166: ...SNMP MIB Objects E 26 3166 A2 GB20 20 March 1999 This page intentionally left blank...
Page 192: ...Equipment List I 2 3166 A2 GB20 20 March 1999 This page intentionally left blank...