Installation
2-6
3166-A2-GB20-20
March 1999
The power-up self-test begins when power is applied. During the power-up
self-test, the Fail LED flashes, then all LEDs blink twice. When the test is
complete, verify that the DSU/CSU is functional by observing that the OK and
NET Sig LEDs are lit.
98-16081
NET
DSU/CSU
3166
Port1
OK
Fail
Test
Sig
OOF
Alrm
EER
DTR
TXD
RXD
CTS
RTS
Select
In
Out
Net
Mon
Summary of Contents for 3166 DSU
Page 1: ...ACCULINK 3166 DSU CSU USER S GUIDE Document No 3166 A2 GB20 20 March 1999...
Page 16: ...About This Guide x 3166 A2 GB20 20 March 1999 This page intentionally left blank...
Page 20: ...Introduction 1 4 3166 A2 GB20 20 March 1999 This page intentionally left blank...
Page 68: ...SDCP Operation 3 42 3166 A2 GB20 20 March 1999 This page intentionally left blank...
Page 102: ...SDCP Menu A 2 3166 A2 GB20 20 March 1999 This page intentionally left blank...
Page 140: ...Pin Assignments D 12 3166 A2 GB20 20 March 1999 This page intentionally left blank...
Page 166: ...SNMP MIB Objects E 26 3166 A2 GB20 20 March 1999 This page intentionally left blank...
Page 192: ...Equipment List I 2 3166 A2 GB20 20 March 1999 This page intentionally left blank...