Instruction Manual ECO LIFT
Page 8 of 32
Version 2.03
These nuts must then be adequately screwed with a 13mm open-end wrench - but not too
tightly in order to avoid any damage to the product.
Preparing the upper frame (version with V-Top)
For the V-Top version of the present product, the two rods for the tilt mechanism and now
also the two rods for the V-Top mechanism are already delivered in a mounted condition
such that no further actions from the side of the user are required in that context (in contrast
to the flat top version).
However, it is necessary to screw the tube holder to the center strand of the V-Top frame at
the points shown above. For this purpose, 2 pcs. of M6 screws and the corresponding
washers (intermediate layer) are used. Please note that if different screw types are included
in your scope of delivery, the thinner (smaller diameter) screws are required to be
appropriated in the given context. In addition, it is important to note in this step that the
shorter of the supplied M6 type screws, namely the galvanized ones, must be used for this
purpose!
Mounting the rails (necessary only for version with V-Top)
If you have chosen a V-top version of your product, you will also need to mount the
separately delivered siderails to the holes provided on the underneath of the table top.
`
`
`
`