SMARTZONE G6 IRUPS USER MANUAL
37
EBP and MBS units. However, the mounting hardware for this technique is provided
with most units. The 3-Phase UPS and EBP unit should not use this mounting technique
due to physical configuration and physical weight of the unit.
CAUTION
⚫
The unit is heavy. Removing the unit from its carton requires a
minimum of two people.
⚫
If installing optional EBP(s), make sure to install the EBP(s)
directly next to the UPS so that all wiring between the units can
use the wiring provided with the units.
NOTE:
Tower mounting stands are required for each individual
unit.
2U Units (U01N11V, U01S11V, U01N12V, U01S12V, U01N13V,
U01S13V, U02N11V, U02S11V, U02N12V, U02S12V, U03N11V,
U03S11V, U03N12V, U03S12V, UVP024, UVP036, UVP048, UVP072)
1. Assemble the tower kit (see Figure 52).
Figure 52: Tower Kit for 2U Units
2. Before the installation of the UPS faceplate, place the unit into the tower kit, for
UPS units manually rotate the LCD panel to vertical display (see Figure 53). The
EBP Battery Pack signage does not rotate.
Summary of Contents for Smartzone U01N11V
Page 66: ...SMARTZONE G6 IRUPS USER MANUAL 65 Appendix F What s Included 5 10kVA EBP UVP240 ...
Page 67: ...SMARTZONE G6 IRUPS USER MANUAL 66 Appendix G What s Included 10 20kVA EBP UVP480 ...
Page 68: ...SMARTZONE G6 IRUPS USER MANUAL 67 Appendix H What s Included Maintenance Bypass Switch UMB20K ...