SMARTZONE G6 IRUPS USER MANUAL
15
Figure 12: Install Cage Nuts in the Front Equipment Rail with Square
Holes
7. Remove the faceplate:
8. Press both sides of EBP faceplate until the latches release and remove (see Figure
13).
Figure 13: Press the Latches and Remove Faceplate
9. Loosen the outer screws on the battery covers, move the battery cover to the center,
then pull the outside out (see Figure 14).
Summary of Contents for Smartzone U01N11V
Page 66: ...SMARTZONE G6 IRUPS USER MANUAL 65 Appendix F What s Included 5 10kVA EBP UVP240 ...
Page 67: ...SMARTZONE G6 IRUPS USER MANUAL 66 Appendix G What s Included 10 20kVA EBP UVP480 ...
Page 68: ...SMARTZONE G6 IRUPS USER MANUAL 67 Appendix H What s Included Maintenance Bypass Switch UMB20K ...