8
8
Sec8.indd 31
2012/02/28 16:14:03
SM830256-00_Single_欧州小筺体 TD&SM.indb 25
16/12/28 13:40:36
Test Operation
Preparation:
Turn on the circuit breaker of units and then turn the power on. After the power is turnedon, remote
controller operation is ignored for approx. 1 minute because setting is being made.
This is not malfunction. (Contents received while setting are disabled.)
1. To start test operation, press and hold the emergency operation button for 10 seconds.
2. The indication lamps (OPERATION, TIMER, STANDBY) blink during test operation.
3. To finish test operation, press and hold the emergency operation button for 10 seconds.
Attention
Do not use this mode for purposes other than the test operation.
(To prevent overload of the units)
Read the installation instructions supplied with the units.
Any of the Heat, Cool and Fan operations can only be performed.
Temperature cannot be changed.
The test operation mode is automatically turned off in 60 minutes.
(To prevent continuous test operation)
Outdoor units do not operate for approx. 3 minutes after the power is turned on or operation is stopped.
8-37
SM830277-00_大洋州向け R32シングル_TD&SM.indb 37
19/02/12 10:54:33
Summary of Contents for S-160PE1R5B
Page 12: ...MEMO Xi SM830277 00_ R32 _TD SM indb 12 19 02 26 9 34 28...
Page 136: ...MEMO 2 16 SM830277 00_ R32 _TD SM indb 16 19 02 28 13 25 27...
Page 164: ...MEMO 4 22 SM830277 00_ R32 _TD SM indb 22 19 02 21 11 54 26...
Page 202: ...MEMO 5 38 SM830277 00_ R32 _TD SM indb 38 19 02 28 13 37 39...
Page 274: ...201903 SM830277 00_ R32 _TD SM indb 1 19 02 12 9 03 53...