1-11-1-1-16
1
1
DRED (Demand controller)
Terminal block
Relay contact point: No voltage relay
Current input is DC 24 V 10 mA
Termrial no. for
demand section
Description
DRM3
Approx. 75% of rated power input
DRM2
Approx. 50% of rated power input
DRM1
Compressor off
Connect the wiring (4-wire) to the Demand section (DRM1, DRM2, DRM3, C) on the terminal block.
The shield part of the shielded cable is connected with (functional earthing) under the terminal block.
Secure the wiring with the cord clamp located on the lower part of the terminal block.
DRM1 DRM2 DRM3 C
WHEN CONNECTING THE DEMAND CONTROLLER INPUT
It is possible to choose various demand levels.
See the table shown on the right.
(Functional earthing)
DRM1 DRM2DRM3 C
DEMAND
Forced
Stop
To the next
System
1
2
1
2
WHEN CONNECTION TO THE FORCED STOP INPUT
With the Forced Stop input, it is possible to override the air conditioning operation to force a stop if a signal is receiv
ed from a fire ala
rm device, etc.
C
DEMAND
Forced
Stop
To the next
System
1
2
1
2
DRM1 DRM2DRM3
(Functional earthing)
Fire alarm device
Terminal block
Relay contact point: No voltage relay
Current input is DC 24 V 2 mA
Use a very small electric current contact point for the relay.
Connect the wiring (2-wire) to points 1 and 2 on the left side of the terminal block.
The shield part of the shielded cable is connected with (functional earthing) under the terminal block.
Secure the wiring with the cord clamp located on the lower part of the terminal block.
WHEN CONNECTING TO THE NEXT SYSTEM UNIT
Forced Stop input can be transferred to the next system unit.
When using the Forced Stop input, connect the wiring to the terminal points 1 and 2 on the right side of the lower part of the terminal block.
The maximum wire/cable length is 100 m.
The demand control cannot be transferred to the next system unit.
When transferring to the next system, the maximum number of connecting units is 30.
1. Connecting the wining to the lower part of the terminal block.
When transferring the Forced Stop input to the next system connect the wiring (2-wire) to the terminal points 1 and 2 at the lower right side of the terminal block.
The shield part of the shielded cable is connected with (functional earthing) under the terminal block.
Secure the wiring with the cord clamp located on the lower part of the terminal block.
2. Connecting the shielded cable to the terminal block for the next system.
For the Forced Stop input, connect the wiring to the terminal points 1 and 2 at the lower right side of the terminal block.
When connecting to the next system be sure to connect to the appropriate terminal point due to the polarity.
DEMAND
Forced
Stop
To the next
System
1
2
1
2
C
C
DEMAND
Forced
Stop
To the next
System
1
2
1
2
DRM1 DRM2DRM3
DRM1 DRM2DRM3
Demand control cannot be transferred to the next system
Connection terminal block for next system outdoor unit
(Functional earthing)
Cord clamp
Connecting line to the next system outdoor unit
Be sure to connect to the appropriate terminal point due to the polarity.
(Functional earthing)
(Functional earthing)
Next system outdoor unit
To the next system outdoor unit
(Functional earthing)
SM830277-00_大洋州向け R32シングル_TD&SM.indb 16
2019/02/27 11:50:46
Summary of Contents for S-160PE1R5B
Page 12: ...MEMO Xi SM830277 00_ R32 _TD SM indb 12 19 02 26 9 34 28...
Page 136: ...MEMO 2 16 SM830277 00_ R32 _TD SM indb 16 19 02 28 13 25 27...
Page 164: ...MEMO 4 22 SM830277 00_ R32 _TD SM indb 22 19 02 21 11 54 26...
Page 202: ...MEMO 5 38 SM830277 00_ R32 _TD SM indb 38 19 02 28 13 37 39...
Page 274: ...201903 SM830277 00_ R32 _TD SM indb 1 19 02 12 9 03 53...