1-11-1-1-17
1
1
2. WIRING PROCEDURE
Follow the wiring procedure below for terminal connection.
(1) Secure and clamp the power and signal lines with the tie, set up close to the valve.
(2) Set the wiring and cables for the power and signal lines to the outdoor unit together, and secure each wire and cable with the tie.
(3) Set up the wiring and cable for the outdoor unit tubing and secure with a tie.
• Outdoor unit / 3-phase model
• Outdoor un
i
t / s
ingl
e-phase mode
l
2
Secure and clamp the wiring and cable with the tie (supplied) for the power and signal lines to
the outdoor unit.
1
Secure and clamp the wiring and cable together with power and signal lines using the tie set up
close to the valve.
3
Secure and clamp all wiring and cable together with the indoor/outdoor tubing using the tie (supplied).
SM830277-00_大洋州向け R32シングル_TD&SM.indb 17
2019/02/27 11:50:48
Summary of Contents for S-160PE1R5B
Page 12: ...MEMO Xi SM830277 00_ R32 _TD SM indb 12 19 02 26 9 34 28...
Page 136: ...MEMO 2 16 SM830277 00_ R32 _TD SM indb 16 19 02 28 13 25 27...
Page 164: ...MEMO 4 22 SM830277 00_ R32 _TD SM indb 22 19 02 21 11 54 26...
Page 202: ...MEMO 5 38 SM830277 00_ R32 _TD SM indb 38 19 02 28 13 37 39...
Page 274: ...201903 SM830277 00_ R32 _TD SM indb 1 19 02 12 9 03 53...