Utility
Installation Manual
247
4.3.6
OGM
Displays information on operating conditions of OGM resources in the system on an OGM
group basis/all OGM groups.
Description
Item
Description
Group No.
1-8: Specifies a desired OGM group.
All: Specifies all OGM groups at once.
Start Time
The Start Time of Traffic Measurement.
(Date)
The date of Traffic Measurement.
Access
Requested
The requested times of the OGM resource (DISA, Wake-up, UCD-
OGM) access.
Access
Succeeded
The succeeded times of the OGM resource (DISA, Wake-up, UCD-
OGM) access.
% completed
The ratio of "Access Succeeded" to "Access Requested."
CCS
One hundred call seconds, or one hundred seconds of telephone
conversation. One hour telephone traffic is equal to 36 CCS.
Summary of Contents for KX-TD500
Page 18: ...Table of Contents 18 Installation Manual ...
Page 54: ...System Outline 54 Installation Manual ...
Page 178: ...Installation 178 Installation Manual ...
Page 182: ...Maintenance Console Guide 182 Installation Manual 4 Click if you accept License Agreement ...
Page 208: ...Maintenance Console Guide 208 Installation Manual ...
Page 271: ...Utility Installation Manual 271 4 Click Capture off The system creates a Log File ...
Page 272: ...Utility 272 Installation Manual ...