Cabinet Installation
Grounding
Grounding
Guidelines
l
Before grounding the DBS 824 read the “Lightning Protection/
Grounding requirements beginning on page l-4
l
The ground cable must be at least 18 AWG
l
Resistance to ground must be 10 Ohms or less
installation
1
Attach the ground cable to the ground screw on the front of the power
2
Connect the ground cable to the building ground
Figure 3-3 Cabinet mound screw
G
Screw
Power Supply
issued
DBS 824-l O-300
3-5
Summary of Contents for DBS 824
Page 1: ...Digital Business System ...
Page 30: ...Panasonic xx Lmsa Digital Business System DBS 824 Installation Dot Part No 550X04601 ...
Page 43: ...2 2 DBS 824 l O 300 Issued 3 l 95 ...
Page 50: ...3 2 DBS 824 10 300 Issued 3 l 95 ...
Page 61: ...4 2 DBS 824 l O 300 issued 3 l 95 ...
Page 74: ...DBS 824 10 300 Issued 3 l 95 ...
Page 104: ...DBS 824 10 300 Issued 3 l 95 ...
Page 118: ... u mw mamaa Digital Business System Section 400 Programming DBS 8 Dot Part No 550X04701 ...
Page 131: ...Intro 2 DBS 824 l O 400 Issued 3 i 95 ...
Page 141: ......
Page 150: ...Page 1 2 DBS 824 l O 400 Issued 3 l I95 ...
Page 279: ...DBS 824 l O 400 Issued 3 l 95 ...
Page 353: ...4 2 DBS 824 10 400 Issued 3 l 95 ...
Page 376: ...5 2 DBS 824 10 400 issued 3 l 95 ...
Page 383: ...6 2 DBS 824 l O 400 Issued 3 l 195 ...
Page 395: ...7 2 DBS 824 10 400 Issued3 l 95 ...
Page 422: ...8 2 DBS 824 10 400 Issued 3 l 95 ...
Page 438: ...9 2 DBS 824 10 400 Issued 3 l 95 ...
Page 443: ...1 o 2 DBS 824 I O 400 Issued 3 l 95 ...
Page 450: ...Appendix A Large Screen Displays Issued 3 l 95 DBS 824 l O 400 A 3 ...
Page 569: ...2 2 DBS 824 10 700 Issued 3 l 95 ...
Page 674: ...DBS 824 10 700 Issued 3 l 95 ...
Page 708: ...5 2 DBS 824 10 700 Issued 3 l 95 ...