8
3.2.3. Front Beam
2
4
3
1
6
5
2
4
3
1
6
5
BOM ID Description
Qty
1
100X150 Profile Attachment Alu 20 cm
2
2
100X150 Profile Attachment Alu 40 cm
1
3
4,8X25 Self Tapping Screw
24
4
Front Beam - 100x150x3mm Al.
1
5
Front Beam Cast Aluminium Cap - Rounded 100x150 mm 2
6
Front Beam Rail Connecting Apparatus - PLUS
3
BOM ID
Description
Qty
1
100x150 Profile Attachment Alu 20 cm
2
2
100x150 Profile Attachment Alu 40 cm
1
3
4,8x25 Self-drilling Screw
24
4
Front Beam - 100x150x3mm Al.
1
5
Front Beam Cast Aluminium Cap - Rounded 100x150mm
2
6
Front Beam Rail Connecting Apparatus - PLUS
3
3.2.4. Pillar
BOM ID
Description
Qty
1
200x200x10mm Aluminium Flange
1
2
100x100mm Aluminium Pillar w/o drainage
1
2
1
2
1
BOM ID Description
Qty
1
200x200x10mm Aluminium Flange
1
2
100x100mm Aluminium Pillar w/o drainage 1
Summary of Contents for SILVER PLUS
Page 1: ...1 Installation Manual Silver Plus Freestanding...
Page 20: ...20 4 1 5 Cross Check and Level Control...
Page 52: ...52...
Page 83: ...83 10 RISK TABLE...
Page 86: ...86 www palmiye eu...