background image

42

4.4.1. Control Box Installation

Synchronized motor control box and / or lighting control box can fix to the cross beams.

In this case, the control box shouldn’t touch the fabric cover sheet on top.

You can make the needed adjustment 
fom fixed corner adjust from fixed carrier 
(located on back of the rail) needed 
adjustment.
First, loose the nut on fixed carrier.

If there is a gap between front fabric 
profile and gutter.

4.4.2. Exact Covering

Summary of Contents for SILVER PLUS

Page 1: ...1 Installation Manual Silver Plus Freestanding...

Page 2: ...nd exact installation of our product We recommend you to read our instruction carefully During installation all necessary actions have to be carried out by authorized and specialized technicians All u...

Page 3: ...83 84 1 Symbols Precautions and Warnings 2 Terminology 3 Packaging 4 Installation Steps 6 Sensors and Automation 7 Hardware 8 Tools 9 Frequently Asked Questions 10 Risk Table 11 Motorization 5 Program...

Page 4: ...eneral Precautions Before starting of any assembly maintenance or cleaning operations make sure that you have fully understood the indications in this manual All electrical connections for the product...

Page 5: ...mm 1 6 Cross Beam 40x120mm 2 7 Side Beam Pillar Until Rail 50x100mm 1 8 Back Pillar 100x100mm 3 9 Side Beam 50x150mm 2 10 Special Side Beam 100x150mm 1 11 Back Covering 100x100x2 5mm 1 12 Cover Side S...

Page 6: ...On receipt of the packed goods and before starting their assembly check the integrity of the material and the presence of all the components necessary for the installation In case of anomalies immedia...

Page 7: ...l bearing set 1 4 Fixed area 1 5 Square nut 1 6 Front roll bearing set 1 7 M8x16 hexagonal hed bolt 1 8 Rail 120x150x3mm Al 1 9 Rail Gasket GS294 2 10 Rail Profile Cast Aluminium End Cap Roundec 1 11...

Page 8: ...us PLUS 3 BOM ID Description Qty 1 100x150 Profile Attachment Alu 20 cm 2 2 100x150 Profile Attachment Alu 40 cm 1 3 4 8x25 Self drilling Screw 24 4 Front Beam 100x150x3mm Al 1 5 Front Beam Cast Alumi...

Page 9: ...50x150mm Aluminium Profile 1 BOM ID Description Qty 1 2 Welded Aluminium Profile 50x150 50x100 1 3 2 6 Side Beam Special 1 1 BOM ID Description Qty 1 50x150mm Aluminum Profile 1 2 1 2 1 BOM ID Descrip...

Page 10: ...el anchorages If you have a decorative fabric M5 5x45mm philips screw M5 5x70mm philips screw are inside the Metal Box It has a blue label on the box 3 Plastic Box Spot LED Rubber for gutter Fabric su...

Page 11: ...11 4 INSTALLATION STEPS 4 1 Structure Installation 4 1 1 Back beam and Back Pillar Installation Back beam and back pillar should be connected by M12x185mm dacromented rod on ground...

Page 12: ...ountersunk Bolt Front Beam 100x150x3mm Al Apply a sealant Aluminium Front Pillar Full Cutted Aluminium Drainage Elbow Plus Full Apply a sealant M12x185 Countersunk Bolt Front Beam 100x150x3mm Al Alumi...

Page 13: ...ed as shown image below In this situation you may need some people since you must hold pillars carefully M12x185 Countersunk Bolt M12x185 Countersunk Bolt In this stage of installation front pillars d...

Page 14: ...150mm Aluminium Fix the apparatus to the profile with 3 5 8x25mm self tapping screws Pass the profile into the fixed apparatus Fix the 50X150mm box profile to the U bracket with 3 4 8x25mm self tappin...

Page 15: ...0x150mm Aluminium Fix the apparatus to the wall pillar with 6 5 5x50mm self tapping screws and chemical dowel Pass the profile into the fixed apparatus Fix the profile to the bracket with 3 4 8x25mm s...

Page 16: ...ainage Fix the apparatus to the front beam with 6 pieces of 4 8x25 mm self tapping screws Attach the profile so that it passes over the fixed apparatus Fix it with 3 pieces of 4 8x25 mm self tapping s...

Page 17: ...e rail and according to rail position When you looking in front of the product the gasket must be inside of the product as you see at below picture 4 1 4 Rail Placing gasket gasket During rail bolts f...

Page 18: ...overlap one to one M8 Nut M8 Washer Stainless Steel M8x20 Socket head Allen Stainless Steel M8 Nut M8 Washer Stainless Steel M8x20 Socket head Allen Stainless Steel M8 Nut M8x20 Socket head Allen Stai...

Page 19: ...19 At first just fasten one screw The rest shall be fixed after cross check Lastly put the rail caps M4 8x25mm Self Tapping Screw M4 8x25mm Self Tapping Screw...

Page 20: ...20 4 1 5 Cross Check and Level Control...

Page 21: ...iagram below When you look at plan view base plates of all pillars stay inside of product border Pillar ground connection detail After the cross checks and level controls now you can fix pillars to ex...

Page 22: ...make sure the gutter profile fits on the elbow properly Place the cap and fasten by screws Place as temporary gutter profile to front beam in order to define the drainage hole and adjust according to...

Page 23: ...ide of the marked position for drainage Create a drip edge with Palmiye s Gutter Hole Bending Apparatus DMR APR P1066 ELGV Apply the sealant behind the gutter profile before installing it When the gut...

Page 24: ...only gutter gasket 30 mm gutter gasket with 30 mm gutter gasket extension profile 30 mm gutter gasket with 50 mm gutter gasket extension profile 50 mm gutter gasket with 50 mm gutter gasket extension...

Page 25: ...25 Fix gutter connector by M5 5x25mm self drilling screw with washer Apply a sealant around gutter connector Place the gutter side cap to end of gutter...

Page 26: ...type at below Place gasket to the gutter channel Secondly apply the adhesive glue as approximately 10cm 4 to gasket channel where is end of the gutter then the adhesive glue will dry Pull back to gask...

Page 27: ...27 Pull gasket and apply a glue Pull gasket and apply a glue If a strainer is preferred place the strainer on the water outlet in the gutter profile and apply silicone Water Outlet Silicon...

Page 28: ...28 Motor box should be centered in between two rails Motor box should be centered in between two rails All carriers must be on the rear 4 2 Motor Box Installation 4 2 1 Motor Box Fixing X X X X...

Page 29: ...ransmitter Plastic Transmission Tube Hexagonal shaft spindle 4 2 2 Motor Shaft Driver Installation Place a Hexagonal shaft spindle to transmission tube On edge sides 40cm 1 3 shaft spindle is used whi...

Page 30: ...Shaft Spindle Shaft Transmitter Plastic Shaft Spindle Shaft Transmitter Plastic Place a shaft spindle and insert shaft transmitter plastic to there Insert a shaft transmitter plastic to transmission t...

Page 31: ...f gap between the rail bracket and the transmitter plastic Also on edge side there are 2 shaft transmitter plastic Fasten bolts on shaft transmitter plastic There is only 1 shaft transmitter plastic o...

Page 32: ...this case you must slide to middle plastics and middle fabric support profile from beginning to its location Gasket for double channeled fabric support profiles Gasket for single channeled fabric sup...

Page 33: ...33 Double channeled fabric support profile Double channeled fabric support profile Double channeled side plastic Double channeled side plastic...

Page 34: ...abric support profile Single channeled fabric support profile However Single channeled fabric support profiles have designed a gap according to the rail position Single channeled side plastic Single c...

Page 35: ...Therefore profile with LED must be placed to related gasked which you can define with wire output at the side channel of fabric In order to cabling exiting hole can be used in the side plastic Single...

Page 36: ...roperly In order to this PALMIYE designed a special tool called Fabric Stretching Equipment When fabric is pulled to the end of the fabric support profile it means fabric has stretched Fabric and end...

Page 37: ...18mm philips head screw In order to install to the retractable pergola carriers there must be a hole You should make a hole carefully by Palmiye special fabric hole cutter After stretching you need to...

Page 38: ...our special fabric elevator Thus you are able to lift up without any damage to the fabric Fabric support profile connection points needs to be lifted aligned and at same time While installing a fabric...

Page 39: ...erations In addition you should slide the deco fabric then fasten from one side then stretch other side At the end the valance fabric shall be installed to the back fabric support profile Firstly ther...

Page 40: ...you can stick fabric using Velcro In order to fix the cross beam you should define an exact U Bracket position It means firstly you have to check fabric cover sheet length after that you can place to...

Page 41: ...extended from the cross beam at least 1cm 1 2 There are 2 different cross beam which is 40x120mm it s located on back and frontier is 42x150mm with gasket The gasket ensures that air does not leak Cr...

Page 42: ...ms In this case the control box shouldn t touch the fabric cover sheet on top You can make the needed adjustment fom fixed corner adjust from fixed carrier located on back of the rail needed adjustmen...

Page 43: ...l fixed carriers should move at equal distance from the end of rail profile 4 4 3 Module Connection If there are two products where is located side by side you must apply a sealant Sealant Sealant Pla...

Page 44: ...Fabric Cover Sheet Installation 4 5 1 Side Covering Fabric Cover Al 63x100mm Fabric Cover Al 63x100mm Cross beam Fabric Cover Al 63x100mm Fabric Cover Al 63x100mm Cross beam At the end fix by M5 5x25...

Page 45: ...finish 100x150mm Aluminium special It is produced by welded 50x100mm and 50x150mm profiles It cannot applied with full drainage 4 6 Side Beam There are two options on side beam 50x150mm Aluminium It...

Page 46: ...et must be fix 6mm 2 outside of the corner pillar alignment 4 6 2 Fixing U Bracket to Wall Side Beam Back Pillar M4 8x25 self drilling screw Side Beam 50x150mm Al M4 8x25 self drilling screw M4 8x25 s...

Page 47: ...ss product a sealant must be applied on top of the side beam profile Place side beam to U bracket on back and align with L bracket on front then fasten screws In addition the side beam can be fix same...

Page 48: ...choose 100x150mm special side beam Define the side beam pillar top U bracket and fasten screws to side beam as you see at below 4 7 2 Until to Rail After fixing the stainless shoe to the ground mount...

Page 49: ...ou may use External Square Downpipe It s 100x100x3mm Aluminium you can integrate water elbow which is drain from gutter to below of the pillar For more information related to Gutter Drilling please re...

Page 50: ...230VAC 50 60Hz Single motor works 120VAC 60Hz or 230VAC 50Hz If the installation is made up of several RTS system only one RTS system must be powered during programming All other RTS systems must be...

Page 51: ...ight 145 151 Colour Silver Silver Pure Compatibility Compatible with a range of Somfy RTS enabled products Radio Frequence For indoor use Radio Range 433 42 MHz Protection Index 200m in open field or...

Page 52: ...52...

Page 53: ...ns on the transmitter SIMULTANEOUSLY motor will jog The OREA RTS motor records the address of this transmitter and only this activated transmitter can be recorded into the memory of the OREA RTS motor...

Page 54: ...SIMULTANEOUSLY motor will jog The ALTUS RTS motor records the address of this transmitter and only this activated transmitter can be recorded into the memory of the ALTUS motor Step 3 Check direction...

Page 55: ...motor jogs to leave the installation mode Front and Back limit needs to be set for Single Motor ALTUS 50 RTS product 5 5 3 Double Motor Step 1 Please have a look at the schedule of below diagram Step...

Page 56: ...ill jog briefly Step 4 Choose your desired channel on the Remote control Step 5 Remove the cap of the Somfy control unit Centralis UNO RTS on the control unit box and press the PROG button until the m...

Page 57: ...tor will jog briefly Now you can control to motor by your remote control Step 8 Right and Left Motor has a switch Yellow and White Press both switch buttons on each motor until they lock in the down p...

Page 58: ...t true You must return the last position to Yellow Button Correct button is White button Motor head by pressing and releasing it The back limit is now set Step 12 Press UP button on your remote contro...

Page 59: ...ave while power ON The LED lights will blink within 10 sec Step 5 Select a channel from your remote control you desired Step 6 Press PROG button on remote control at least 2 sec The lights have stored...

Page 60: ...5 seconds until the motor jogs 5 6 3 LED Light Control Panel 5 6 3 1 RGB LED Resetting Step 1 Give energy to control box and wait until red light is on at control box Step 1 Power OFF and power ON 10...

Page 61: ...an be memorized in a motor and one EOLIS RTS Sensor can be memorized in several motors Enter the learning mode Press more than 2 seconds on the programming button of a RTS control which is already mem...

Page 62: ...control after 30 sec 6 1 2 Single Motor Connection to SOLIRIS RTS Sun and Wind Sensor On Orea RTS Motor connection to SOLIRIS RTS Sun Wind Sensor 6 1 2 1 Programming The motor must be in programming...

Page 63: ...nsor IMPORTANT REMARKS BEFORE INSTALLATION Expose the sensor 20min to the daylight to initialize its autonomous system put the cells under the maximum daylight intensity To verify charging level of se...

Page 64: ...INSTRUCTIONS o Make sure to install sensor vertically and in place where solar cells can catch daylight intensity o Sensor delivered without screws use the screw adapted to your wall support SUN FUNC...

Page 65: ...OLIS or SOLIRIS Sensor We use the Universal RTS Receiver on Tandem motors system The Universal receiver RTS is compatible with all standard SOMFY wired motors Cabling arrangements are shown in the dia...

Page 66: ...N 10 Motor UP 11 Power supply earth yellow green 12 Motor earth yellow green 6 1 4 2 Programming Installing or Removing a Transmitter Enter Programming Mode Press the programming button of the Univers...

Page 67: ...Centralis The Centralis ensures that communication between transmitter and synchronizing control unit box But it can t communicate between rain sensor and synchronizing control unit box The ONDEIS ra...

Page 68: ...lecttheRTSaddressonthechannelselectorcorrespondingtodrycontactconnectors Press to PROG button on your remote control Then press PROG button on RS485 or Dry Contact Transmitter If you supplied any time...

Page 69: ...OID system https play google com store apps details id com somfy connexoon_window gl TR The retractable pergola system motors can control by CONNEXOON Window RTS application on smart phone CONNEXOON W...

Page 70: ...S address n0 5 Press the programming button on the back of the RTS control point or the RTS receiver until the motor jogs The product is in programming mode Press the programming button on the RS485 R...

Page 71: ...ess steel washer M8 stainless steel nut Back pillar profile Back beam profile M12x185mm countersunk bolt Back pillar profile Back beam profile M12x185mm countersunk bolt M8x20mm Socket head Allen Stai...

Page 72: ...nnection M4 8x25mm self drilling screw 7 4 Pillar Front Beam Connection M12x185mm hexagonal head dacromented bolt M4 8x25mm Self Tapping Screw M4 8x25mm Self Tapping Screw M12x185mm Countersunk Bolt M...

Page 73: ...tainless Steel Nut 7 6 Motor Back Beam Connection M5 5x25mm self drilling screw with washer M12 Galvanized Rod M12 Nut Stainless Steel M12 Washer Stainless Steel M12 Galvanized Rod M12 Nut Stainless S...

Page 74: ...c Carrier Connection M8 nut with sealant 7 8 Gutter Front Beam Connection M5 5x25mm self tapping screw with washer M8 nut with sealant M8 nut with sealant M5 5x25mm Self tapping Screw M5 5x25mm Self t...

Page 75: ...ng screw M4 8x25mm Self Tapping screw 7 9 Side Beam Front Beam Connection M4 8x25mm self drilling screw 7 10 Side Beam Wall Connection M4 8x25mm self drilling screw M4 8x25mm Self Tapping Screw M4 8x2...

Page 76: ...m Pillar Connection M4 8x25mm self drilling screw 7 12 Cross Beam Rail Connection M4 8x25mm self tapping screw M4 8x25mm Self Tapping Screw M4 8x25mm Self Tapping Screw M4 8x25mm Self Tapping Screw M4...

Page 77: ...77 M4 8x25mm self tapping screw 7 13 Fabric Cover Sheet Cross Beam Connection M5 5x25mm self drilling screw with washer M4 8x25mm self tapping screw M4 8x25mm self tapping screw...

Page 78: ...e T Shirt for Installation teams HZM ISG G1009BRUT Palmiye Trousers for Installation teams HZM ISG G1014 BRUT Palmiye Waistcoat for Installation teams HZM ISG 1013 BRUT Sealant NP1 Dark Brown to block...

Page 79: ...round wall ceiling HRD CVT G1062 PSMZ M12 Washer Stainless Steel part to to fix and stabilaze products to ground wall ceiling HRD PUL G0003 PSMZ M30 Washer Galvanized part to to fix and stabilaze prod...

Page 80: ...piral grinder 1 pc Batery driller 1 pc Electric impact drill 1 pc Lighting 2 pc Extansion lead 2 pc Ladder 2 pc Tape measure 5m 1 pc Tape measure 10m 1 pc Water gauge 2 pc Laser Meter 1 pc 35 cm angle...

Page 81: ...Set Plastic hammer 1 pc Iron hammer 2 pc Electrical screw driver 2 pc Cutter 1 pc Slicon gun 2 pc Bits 2 Set PH2X100 Bits 2 pc APEX 493 A Bits 2 pc Insulating Tape Black 6 pc Insulating Tape White 6...

Page 82: ...the fuse The motor starts but the pergola won t move Possibly broken belts or disconnection from drive shaft Contact Palmiye The pergola moves errati cally Dirty rails rails not properly aligned Clean...

Page 83: ...83 10 RISK TABLE...

Page 84: ...0VAC 60Hz using electricity countries They are controlling by remote control device Nominal Torque Nominal Speed Rated Power Rated Current Thermal Tripping Noise OREA 60 55Nm 17rpm 290W 1 25A 130 C 64...

Page 85: ...C 65dBA LT60 ALTUS 60Nm 530in lbs 14rpm 300W 2 5A 5 min 63dBA 80Nm 700in lbs 14rpm 400W 3 4A 5 min 65dBA 100Nm 880in lbs 14rpm 450W 3 8A 5 min 67dBA 230VAC 50Hz 120VAC 60Hz 11 2 Double Motor Somfy LT6...

Page 86: ...86 www palmiye eu...

Reviews: