![Painless Performance 10309 Instructions Manual Download Page 92](http://html2.mh-extra.com/html/painless-performance/10309/10309_instructions-manual_3257239092.webp)
86
#1)
Splicing
- This is when you connect multiple wires to a single wire to distribute
power/ground to multiple components. In this case, splice off the
#935
wire and running
wires to several gauges to provide power to each gage.
#2)
Chaining or Jumpering
- Run the #935 wire to a power post, before terminating the
wire with the proper terminal, you will insert another wire into the terminal and crimp.
You will now have 2 wires in one terminal. This additional wire will then route to the
power post on another gauge. Before terminating that wire with the proper terminal, you
will insert another wire into the terminal; and so on.