Upon receipt, please check delivery for

possible  damages  caused  during  transport.
Carry out visual check of the protection caps for
damages. Please check valve inner for contam-
ination.

In  case  of  such  or  similar  faults,  only  accept
delivery  under  reserve.  Lodge  complaint  with
due consideration of the deadline. 
Please only remove protection caps and trans-
port protections immediately before installation.

5.2 Installation of “Floorbox”

The  possible  depth  of  the  water  meter
has to be considered during installation!

The  depth  is  determined  by  the  designated
heat meter and produces the measure T1. The
frame  has  to  be  pulled  out  according  to  the
calculated depth.

After installation of the “Floorbox”, the supply
pipe  is  laid  from  one  room  to  the  other.  The
individual  heating  surface  circuits  are
connected via derivations from the supply pipe
(see illustr. 5.2). 

5.3 Filling

The heating system has to be filled and flushed.
Add an antifreeze liquid for frost protection.

5.4 Bleeding

The venting and flushing valves of the “Floorbox”
as  well  as  those  of  the  succeeding  “Unibox”
can  be  used  to  bleed  the  system  even  under
working conditions. 

5.5 Leakage test

The installation has to be checked for leaks and
the result has to be documented in a record. 

5.6 Subsequent installation of heat

meters

Standard  heat  meters  with  flat  sealing  bodies
can subsequently be installed in the return pipe:

• with a length of 110 mm and G 

3

4

male

threads and

• with a length of 130 mm and G 1 male

threads.

The double regulating and commissioning valve
in  front  of  the  meter  stool  piece  and  the  ball
valve behind it, must be closed off. 

The couplings have to be unscrewed.

The  sealing  surfaces  should  be  cleaned  and
new flat seals should be used during assembly.

A heater meter body with a length of 130 mm
and  G  1  male  threads  is  mounted  directly
between the couplings. 

When using a heat meter with a length of 110 mm
and G 

3

4

male threads, the reducers have to be

screwed onto the body first. After that, the body
is mounted between the couplings. 

The water meter bodies and the collar nut of the
coupling are to be lead sealed. 

The  ball  valve  and  the  double  regulating  and
commissioning  valve  have  to  be  opened  and
the heating system has to be bled and checked
for leaks. 

Due to the heat meter, the pressure loss within
the  installation  is  increased.  The  presetting  of
the double regulating and commissioning valve
“Hycocon VTZ” has to be increased in such a
way that the initial design status is reproduced.

Illustr. 5.1: Depth “Floorbox”

1

3

0

x

G

1

1

1

0

x

G

3

/4

46

T1

110

35

Summary of Contents for 1022668

Page 1: ...n auf Zustand Sch den und Funktion kontrollieren Betriebsanleitung lesen Inhalt 1 Allgemeines 2 1 1 Information zur Betriebsanleitung 2 1 2 Symbolerkl rung 2 1 3 Urheberschutz 2 2 Sicherheitshinweise...

Page 2: ...Bilder und sonstigen Darstellungen sind urheberrechtlich gesch tzt 2 Sicherheitshinweise Die Armatur muss von einem Fachbetrieb unter Beachtung der geltenden Normen und Vor schriften installiert werd...

Page 3: ...ftungs Sp l ventil und Anschlussst ck Pos 3 weitere 4 Flachdichtungen f r G 1 Verbin dungen Pos 5 Art Nr 1022669 Untere Anbindung Abb 4 2 F r den Vorlauf Kugelhahn mit Temperaturf hleranschluss M 10 x...

Page 4: ...auf Dichtheit zu pr fen Das Ergebnis ist in einem Protokoll festzuhalten 5 6 Nachr sten von W rmemengen z hlern Im R cklauf k nnen handels bliche W rme mengenz hler mit flachdichtenden Geh usen nachge...

Page 5: ...iagramm 7 1 zu ber cksichtigen Der Druck verlust am Strangregulierventil geht zus tzlich in die Berechnung ein Der am Hycocon VTZ Strangregulierventil zu drosselnde Differenzdruck muss berechnet werde...

Page 6: ...1 2 mbar 2 mbar Druckverlust W rmemengen z hler Beispiel 125 mbar Pumpendruck abz glich Druckverluste Muss durch Strangregulier ventil augeglichen werden 490 mbar 180 mbar 2 mbar 308 mbar 490 mbar 180...

Page 7: ...anation 8 1 3 Copyright 8 2 Safety notes 8 3 Technical data 8 3 1 Dimensions 8 3 2 Performance data 8 4 Construction and function 9 4 1 Summary 9 4 2 Functional description 9 5 Installation and assemb...

Page 8: ...awings images and other illustrations are copyrighted 2 Safety notes The Floorbox has to be installed by an autho rised specialist tradesman with due consideration of valid standards and rules We do n...

Page 9: ...ngle pattern fitting venting and flushing valve and connection fitting pos 3 4 flat seals for G 1 connections pos 5 Item no 1022669 Lower connection illustr 4 2 For the supply Ball valve with temperat...

Page 10: ...est The installation has to be checked for leaks and the result has to be documented in a record 5 6 Subsequent installation of heat meters Standard heat meters with flat sealing bodies can subsequent...

Page 11: ...of 6 6 m3 h chart 7 1 has to be consid ered for the Floorbox The pressure loss at the double regulating and commissioning valve must also be included the calculations The differential pressure to be t...

Page 12: ...ssure loss Floorbox lateral connection chart 7 1 2 mbar 2 mbar Pressure loss heat meter example 125 mbar Pump pressure less pressure losses To be compensated by DRV 490 mbar 180 mbar 2 mbar 308 mbar 4...

Page 13: ...tions concernant les instructions de montage et le mode d emploi 14 1 2 Explication des symboles 14 1 3 Droits d auteur 14 2 Conseils de s curit 14 3 Donn es techniques 14 3 1 Encombrements 14 3 2 Don...

Page 14: ...on des symboles Les conseils concernant la s curit de personnes et de l installation sont marqu s par des symboles Ces conseils doivent tre respect s afin d viter des accidents des d g ts mat riels et...

Page 15: ...VTZ avec raccord d angle robinet de purge et de rin age et pi ce de raccordement pos 3 4 joints plats additionnels pour raccorde ments G 1 pos 5 R f 1022669 Raccordement par le bas illustr 4 2 Pour l...

Page 16: ...du Floorbox ou ceux de l Unibox en aval 5 5 Test d tanch it L tanch it de l installation est tester et le r sultat est consigner dans un proc s verbal 5 6 Montage ult rieur de compteurs de calories De...

Page 17: ...vs de 6 6 m3 h pour le Floobox diagramme 7 1 La perte de charge au robinet d quilibrage est rajouter au calcul La pression diff rentielle compenser par le robinet d quilibrage Hycocon VTZ doit tre cal...

Page 18: ...rdement lat ral diagramme 7 1 2 mbars 2 mbars Perte de charge compteur de calories exemple 125 mbars Pression de pompe moins pertes de charge A compenser par robinet d quilibrage 490 mbars 180 mbars 2...

Page 19: ......

Page 20: ......

Reviews: