6.1 Regulation of double regulating

and commissioning valve

A hydronic balance between the various risers
of the heating system according to VOB C/DIN
18380 has to be carried out. This way, all parts
of the system are supplied with heat according
to the design.

As  for  the  Oventrop  “Floorbox”,  the  hydronic
balancing  is  carried  out  with  the  help  of  the
double  regulating  and  commissioning  valve
“Hycocon VTZ”.

Presetting ca be determined by using the Oven-
trop software for pipework calculation. Setting
of the calculated value is carried out according
to the enclosed instructions of the double regu-
lating and commissioning valve.

When calculating the installation manually, a k

vs

value of 6.6 m

3

/h (chart 7.1) has to be consid-

ered for the “Floorbox”. The pressure loss at the
double  regulating  and  commissioning  valve
must also be included the calculations.

The  differential  pressure  to  be  throttled  at  the
double  regulating  and  commissioning  valve
“Hycocon VTZ” has to be calculated. With the
known flow rate in the design point, the preset-
ting can be taken from chart 7.2.

When using the fill and drain tool (item

no.  1061791)  or  the  measuring  needles  (item
no. 1061799), the double regulating and com-
missioning  valve  “Hycocon  VTZ”  has  to  be
turned to the front by 90°.

Illustr. 5.2: Example installation sketch lateral connection

Given:

“Floorbox“
lateral
connection

“Floorbox“
lateral
connection
with heat meter

Number of
heating circuits

4

4

Flow rate

280 kg/h

280 kg/h

Pressure loss
including
risers

180 mbar

180 mbar

Pump pressure

490 mbar at 880 kg/h

6.2 Calculation example

Surface heating

Surface heating

“Unibox E BV“

Supply

Return

“Unibox E BV“

Summary of Contents for 1022668

Page 1: ...n auf Zustand Sch den und Funktion kontrollieren Betriebsanleitung lesen Inhalt 1 Allgemeines 2 1 1 Information zur Betriebsanleitung 2 1 2 Symbolerkl rung 2 1 3 Urheberschutz 2 2 Sicherheitshinweise...

Page 2: ...Bilder und sonstigen Darstellungen sind urheberrechtlich gesch tzt 2 Sicherheitshinweise Die Armatur muss von einem Fachbetrieb unter Beachtung der geltenden Normen und Vor schriften installiert werd...

Page 3: ...ftungs Sp l ventil und Anschlussst ck Pos 3 weitere 4 Flachdichtungen f r G 1 Verbin dungen Pos 5 Art Nr 1022669 Untere Anbindung Abb 4 2 F r den Vorlauf Kugelhahn mit Temperaturf hleranschluss M 10 x...

Page 4: ...auf Dichtheit zu pr fen Das Ergebnis ist in einem Protokoll festzuhalten 5 6 Nachr sten von W rmemengen z hlern Im R cklauf k nnen handels bliche W rme mengenz hler mit flachdichtenden Geh usen nachge...

Page 5: ...iagramm 7 1 zu ber cksichtigen Der Druck verlust am Strangregulierventil geht zus tzlich in die Berechnung ein Der am Hycocon VTZ Strangregulierventil zu drosselnde Differenzdruck muss berechnet werde...

Page 6: ...1 2 mbar 2 mbar Druckverlust W rmemengen z hler Beispiel 125 mbar Pumpendruck abz glich Druckverluste Muss durch Strangregulier ventil augeglichen werden 490 mbar 180 mbar 2 mbar 308 mbar 490 mbar 180...

Page 7: ...anation 8 1 3 Copyright 8 2 Safety notes 8 3 Technical data 8 3 1 Dimensions 8 3 2 Performance data 8 4 Construction and function 9 4 1 Summary 9 4 2 Functional description 9 5 Installation and assemb...

Page 8: ...awings images and other illustrations are copyrighted 2 Safety notes The Floorbox has to be installed by an autho rised specialist tradesman with due consideration of valid standards and rules We do n...

Page 9: ...ngle pattern fitting venting and flushing valve and connection fitting pos 3 4 flat seals for G 1 connections pos 5 Item no 1022669 Lower connection illustr 4 2 For the supply Ball valve with temperat...

Page 10: ...est The installation has to be checked for leaks and the result has to be documented in a record 5 6 Subsequent installation of heat meters Standard heat meters with flat sealing bodies can subsequent...

Page 11: ...of 6 6 m3 h chart 7 1 has to be consid ered for the Floorbox The pressure loss at the double regulating and commissioning valve must also be included the calculations The differential pressure to be t...

Page 12: ...ssure loss Floorbox lateral connection chart 7 1 2 mbar 2 mbar Pressure loss heat meter example 125 mbar Pump pressure less pressure losses To be compensated by DRV 490 mbar 180 mbar 2 mbar 308 mbar 4...

Page 13: ...tions concernant les instructions de montage et le mode d emploi 14 1 2 Explication des symboles 14 1 3 Droits d auteur 14 2 Conseils de s curit 14 3 Donn es techniques 14 3 1 Encombrements 14 3 2 Don...

Page 14: ...on des symboles Les conseils concernant la s curit de personnes et de l installation sont marqu s par des symboles Ces conseils doivent tre respect s afin d viter des accidents des d g ts mat riels et...

Page 15: ...VTZ avec raccord d angle robinet de purge et de rin age et pi ce de raccordement pos 3 4 joints plats additionnels pour raccorde ments G 1 pos 5 R f 1022669 Raccordement par le bas illustr 4 2 Pour l...

Page 16: ...du Floorbox ou ceux de l Unibox en aval 5 5 Test d tanch it L tanch it de l installation est tester et le r sultat est consigner dans un proc s verbal 5 6 Montage ult rieur de compteurs de calories De...

Page 17: ...vs de 6 6 m3 h pour le Floobox diagramme 7 1 La perte de charge au robinet d quilibrage est rajouter au calcul La pression diff rentielle compenser par le robinet d quilibrage Hycocon VTZ doit tre cal...

Page 18: ...rdement lat ral diagramme 7 1 2 mbars 2 mbars Perte de charge compteur de calories exemple 125 mbars Pression de pompe moins pertes de charge A compenser par robinet d quilibrage 490 mbars 180 mbars 2...

Page 19: ......

Page 20: ......

Reviews: