![OutBack Power EnergyCell 1100RE Installation Manual And Owner'S Manual Download Page 50](http://html1.mh-extra.com/html/outback-power/energycell-1100re/energycell-1100re_installation-manual-and-owners-manual_1660771050.webp)
Publication No. US-VR-OM-002
March 2008
www.enersys.com
11
BEFORE INSTALLATION
READ THIS SECTION THOROUGHLY.
5.0 INSTALLATION CONSIDERATIONS
5.1 General
If you have any questions concerning the installation considerations, contact your EnerSys
®
sales/service representative for clarification or call the corporate office number listed on the
back of this manual and ask for EnerSys Reserve Power Service.
When planning the system space requirements, consider the following:
•
space
• ventilation
•
environment
•
battery system configuration
•
temperature
• floor loading
•
distance from operating equipment
• floor anchoring
Table 5.1 will assist you to ensure that all requirements for installation location are considered.
Space
Aisle space should be in accordance with the National Electric Code
(NEC) Article 110-16 or local codes.
Clearance from wall/equipment - 4” (10 cm) minimum
Environment
Clean, cool and dry. The location should be selected to keep water,
oil, and dirt away from all cells.
Temperature
Ambient temperature between 72˚-78˚F (23˚-26˚C)
Elevated temperatures reduce operating life. Lower temperatures
reduce battery performance.
Minimize temperature variations between the cells. (To avoid
temperature variation between the cells, do NOT locate the battery
near HVAC ducts or exhausts, heats sources (i.e., equipment that
generates heat) or direct sunlight.
CONSIDERATION
RECOMMENDATION
TABLE 5.1
Summary of Contents for EnergyCell 1100RE
Page 1: ...EnergyCell RE High Capacity Battery Installation Guide and Owner s Manual...
Page 4: ......
Page 28: ...Page 18 Publication No US DDm IM 003 www enersysinc com November 2003 NOTES...
Page 29: ......
Page 66: ...BATTERY MAINTENANCE REPORT DDm DDS DDV DGX mSeries and SC...
Page 67: ...BATTERY MAINTENANCE REPORT DDm DDS DDV DGX mSeries and SC...
Page 69: ...30 www enersys com Publication No US VR OM 002 March 2008 NOTES...