PowerSafe DDm
Publication No. US-DDm-IM-003
Page 9
November 2003
www.enersysinc.com
Starting at the bottom of the FRONT verticals:
1. Insert FRONT horizontal channels into the
vertical channels. Center the horizontals
between the verticals. See figures 13A &
13B.
2. Bolt horizontal channels to vertical channels.
Refer to below list for hardware order and
Figure 14.
NOTE:
The bottom two horizontals require full
thread longer bolts at the vertical channel.
Bottom horizontal:
–
Serrated Hex Bolt (M10x1.5 – 100mm
Full Threads),
–
Rack Frame,
–
External Tooth Washer,
–
Flat Washer,
–
Lock Washer,
–
Hex Nut
Second from bottom horizontal:
–
Serrated Hex Bolt
(M10x1.5 – 75mm Full Threads),
–
Rack Frame,
–
External Tooth Washer,
–
Flat Washer,
–
Lock Washer,
–
Hex Nut
All other horizontals:
– Serrated Hex Bolt (M10x1.5 – 25mm)
3. Finger-tighten
connections.
4. Install ALL FRONT horizontals before
continuing.
INSTALL FRONT HORIZONTAL
CHANNELS
FIGURE 13A
INSTALL FRONT HORIZONTAL
CHANNELS
FIGURE 13B
REAR HORIZONTAL CHANNEL HARDWARE
DETAIL
FIGURE 14
Summary of Contents for EnergyCell 1100RE
Page 1: ...EnergyCell RE High Capacity Battery Installation Guide and Owner s Manual...
Page 4: ......
Page 28: ...Page 18 Publication No US DDm IM 003 www enersysinc com November 2003 NOTES...
Page 29: ......
Page 66: ...BATTERY MAINTENANCE REPORT DDm DDS DDV DGX mSeries and SC...
Page 67: ...BATTERY MAINTENANCE REPORT DDm DDS DDV DGX mSeries and SC...
Page 69: ...30 www enersys com Publication No US VR OM 002 March 2008 NOTES...