![OutBack Power EnergyCell 1100RE Installation Manual And Owner'S Manual Download Page 20](http://html1.mh-extra.com/html/outback-power/energycell-1100re/energycell-1100re_installation-manual-and-owners-manual_1660771020.webp)
Page 10
Publication No. US-DDm-IM-003
www.enersysinc.com
November
2003
Cell Support Shelves
Starting at the bottom of the rack:
1. Place shelves over FRONT and REAR
horizontals. See Figure 15.
2. Align holes of shelf with holes of horizontal
channels. Bolt the shelf to the REAR
horizontal using (2) M10x1.5 – 25mm
Serrated Hex Bolts in the two OUTSIDE
holes of the shelf. See Figure 16.
3. Torque these bolts to 20 ft-lbs.
4. After ALL shelves for the rack are in place,
position the vertical channels so that the
front and rear horizontals fit tightly against
the shelves. See Figure 17.
5. Torque ALL bolts connecting the horizontals
to the verticals to 20 ft-lbs.
6. If you are installing a MULTI-STACK WITH
ZERO SEPARATION system, repeat
Procedures 1 through
5 until all shelves are
installed.
7. Torque all anchor bolts according to system
design and manufacturer’s
recommendations.
INSTALL BOTTOM CELL
SUPPORT SHELF
FIGURE 15
CELL SUPPORT SHELF
REAR HARDWARE DETAIL
FIGURE 16
INSTALL CELL SUPPORT
SHELVES
FIGURE 17
NOTE:
MULTI-STACK WITH ZERO
SEPARATION systems are fastened
together at the top front and top rear with
a tie bar.
Summary of Contents for EnergyCell 1100RE
Page 1: ...EnergyCell RE High Capacity Battery Installation Guide and Owner s Manual...
Page 4: ......
Page 28: ...Page 18 Publication No US DDm IM 003 www enersysinc com November 2003 NOTES...
Page 29: ......
Page 66: ...BATTERY MAINTENANCE REPORT DDm DDS DDV DGX mSeries and SC...
Page 67: ...BATTERY MAINTENANCE REPORT DDm DDS DDV DGX mSeries and SC...
Page 69: ...30 www enersys com Publication No US VR OM 002 March 2008 NOTES...