7 Operation
Operating instructions GF 4 (AVM / MVM)
40
(01.08)
MT_GF 4_BA_04_790142762_01.doc
orbitalum tools
gmbh
8. Switch the motor on.
9. Carefully turn the motor clockwise using the handle (1) until the pipe wall has
been pierced through.
10. Continue turning rapidly until the pipe has been cut off.
11. Switch the motor off and allow the machine to run to a stop.
7.9.2
Beveling the pipe manually
Danger of being injured by chips flying around
:
Never
work without the saw blade guard mounted.
X
Wear protective goggles.
If the pipe cutter was out of operation for a longer time:
–
Turn the cutter motor by 180°.
–
Switch the pipe cutter on and let it run for about 10 seconds.
This will lubricate all gear components.
1. Set the pipe diameter (see chapter 7.4, p. 26).
2. Adjust the bevel cutter to the pipe diameter (see chapter 7.4.3, p. 29).
3. Tighten the hexagon nut of the bevel cutter fixture, if necessary
(see chapter 7.3, p. 25).
4. Adjust the spindle speed (see chapter 7.6, p. 31).
5. Push the pipe through the vice up to the desired length and clamp it. Support
pipes with a length of more than 1 m using a pipe feeder
(see chapter 7.4, p. 26).
Pull off the vice handle from the spindle before the slide housing starts rotating.
WARNING
Important
Important
1
Summary of Contents for GF 4 AVM
Page 51: ......