![background image](http://html.mh-extra.com/html/orbitalum/gf-4-avm/gf-4-avm_operating-instructions-manual_1648241036.webp)
7 Operation
Operating instructions GF 4 (AVM / MVM)
32
(01.08)
MT_GF 4_BA_04_790142762_01.doc
orbitalum tools
gmbh
7.7
Processing the pipe with GF 4 AVM
See chapter 7.8, p. 36 for processing the pipe with GF 4 MVM.
See chapter 7.9, p. 39 for GF 4 without AVM or MVM.
The AVM may only be operated in conjunction with the Orbitalum Tools
pipe cutter GF 4.
:
Do
not
connect any other devices to the socket of the AVM.
7.7.1 Commissioning
1. Connect the pipe cutter to the socket (1) of the AVM.
2. Connect the main cable of the AVM to the main power supply.
After unlocking the EMERGENCY OFF button, the number of the current
software version will appear on the display for approx. 1 second. After this
second has passed, the control system will supply the cutter motor with power
and is thus ready to operate (the currently selected feed force level is
indicated).
Important
1
Summary of Contents for GF 4 AVM
Page 51: ......