7 Operation
Operating instructions GF 4 (AVM / MVM)
30
(01.08)
MT_GF 4_BA_04_790142762_01.doc
orbitalum tools
gmbh
7.5
Adjusting the length gauge
A length gauge is available as an optional accessory for producing pipe
sections of equal length (code no. 790 041 011, for all GF and RA types
except RA 12).
1. Place the length gauge (1) in the holding fixture (2).
2. Swivel the cut-off stop to the middle of the pipe.
3. Use a meter rule to extend the gauge to the desired length (slot for meter rule,
see chapter 7.1.5, p. 23).
4. Position the clamp (3) flush with the housing and turn it so that it rests on the
workbench.
5. Tighten the clamp (3).
6. Move the pipe forward up to the cut-off stop and clamp it into place.
7. Swivel the cut-off stop outward and push it all the way back.
8. Cut the pipe (see chapter 7.7, p. 32 for GF 4 AVM, chapter 7.8, p. 36 for GF 4
MVM and chapter 7.9, p. 39 for working without AVM/MVM).
9. For the next cut, extend the cut-off stop and swing it into place clockwise.
3
1
2
Note
Summary of Contents for GF 4 AVM
Page 51: ......