Install Shelf Rails and Back Mounting Brackets
The template has rack alignment images on either side; one for the back rack alignment
[1], and one for the front rack alignment [2].
b.
Place the cage nuts in the locations indicated by the rack alignment
template.
Place the cage nuts on the inner-facing side of each rail. There are two cage nuts in each
front rail and three cage nuts in each back rail.
Note -
The front of the server has four screws per side. When you place the server in the rack,
the top two screws attach to the cage nuts that you install in the rack rails. The bottom screws
pass through the holes in the rack and fasten to the shelf rails.
To use the cage nut insertion tool, see
“Use the Cage Nut Insertion Tool” on page 50
.
5.
Install the left and right shelf rails.
The rails are labeled left and right, front and back.
52
Oracle Server X8-8 Installation Guide • June 2019
Summary of Contents for X8-8
Page 1: ...Oracle Server X8 8 Installation Guide Part No E93400 02 June 2019 ...
Page 2: ......
Page 10: ...10 Oracle Server X8 8 Installation Guide June 2019 ...
Page 24: ...24 Oracle Server X8 8 Installation Guide June 2019 ...
Page 40: ...40 Oracle Server X8 8 Installation Guide June 2019 ...
Page 72: ...72 Oracle Server X8 8 Installation Guide June 2019 ...
Page 112: ...112 Oracle Server X8 8 Installation Guide June 2019 ...
Page 122: ...122 Oracle Server X8 8 Installation Guide June 2019 ...
Page 134: ...134 Oracle Server X8 8 Installation Guide June 2019 ...