Tip:
When the library capacity is more than 300 cartridges, you will not
connect the output port for Module 6 through Module 10 now. You
connect the port when installing Module 11 through Module 15.
2.
Install the tape drive assembly.
See
3.
Install the tape drive filler.
See
.
4.
Install the power supply.
See
5.
Install the power supply filler.
See
Install a Power Supply Slot Cover
.
6.
Insert the cartridge magazines.
See
Replace the Cartridge Magazines
.
Install the Remaining Expansion Modules
Replace modules below the new Expansion Module.
1.
Locate the next Expansion Module for installation (refer to the module number
label on the back of the module).
2.
Repeat the installation tasks until all Expansion Modules and CRUs are installed.
See
Install the Expansion Module Chassis
.
See
Install CRUs, Fillers, and Magazines in Replaced Module
.
3.
Make sure you have installed the floor in the bottom module.
See
Install the Floor in the Bottom Expansion Module
Cable the Library and Power On After Installing the Expansion Module
After installing the module, you must reconnect cabling and power on the library.
1.
Reconnect all cables.
See
.
2.
Secure the hook and loop strap to the replaced Expansion Module (close the
plunger of the rivet).
3.
Align, dress, and secure cables in the hook and loop straps.
4.
Follow the power on procedures.
See
Validate the Component Installation
Chapter 10
Expansion Module Chassis Removal and Replacement (FRU)
10-21