
1.
Remove the functional components as applicable:
•
•
•
•
Remove the Power Supply Slot Cover
•
2.
Remove the failed Expansion Module.
Replace the Expansion FRU Chassis
Replacing the Expansion Module is very similar to installing a new Expansion Module.
•
Install the Expansion Module Chassis
•
Install CRUs, Fillers, and Magazines in Replaced Module
•
Install the Remaining Expansion Modules
•
Cable the Library and Power On After Installing the Expansion Module
Install the Expansion Module Chassis
Install the Expansion Module in the rack below an existing module.
1.
Grasp the Expansion Module chassis by the sides and remove it from the shipping
carton.
2.
Remove the magazines from the Expansion Module.
See
Prepare the Expansion Module by Removing the Cartridge Magazines
.
3.
If this will be the bottom module of the library, install the library floor now.
See
Install the Floor in the Bottom Expansion Module
4.
Mount the module.
See
.
5.
Install the rails.
See
Install the Rear Rails for the Expansion Module
6.
Secure the module.
See
Secure the Expansion Module to the Rack Front
Install CRUs, Fillers, and Magazines in Replaced Module
Reinstall the functional components removed from the defective Expansion Module.
1.
Install the module controller.
See
.
Chapter 10
Expansion Module Chassis Removal and Replacement (FRU)
10-20