Installing the Server
Follow these procedures to prepare and secure the server at the installation site.
Related Information
■
“Preparing the Site” on page 19
■
“Preparing for Installation” on page 67
■
“Connecting the Front SP Cables” on page 97
■
“Connecting the Rear Power Cords and Data Cables” on page 119
▼
Confirm the Site Preparation
1. Review the safety guidelines.
See
“Oracle Safety Information” on page 69
for more information.
Step
Description
Link
1
Inspect the installation site and prepare it for the
server installation.
“Confirm the Site Preparation” on page 73
2
Receive and unload the server from the delivery
truck.
“Receive the Server” on page 75
3
Unpack the server from the shipping container.
“Unpack the Server” on page 76
4
Safely move the server to the installation site.
“Moving the Server” on page 78
5
Stabilize the server to the installation site’s floor
using the leveling feet and (optionally) using
mounting brackets.
“Stabilizing the Server” on page 87
6
Install any optional hardware like PCIe cards.
Summary of Contents for sparc M5-32
Page 1: ...SPARC M5 32 and SPARC M6 32 Servers Installation Guide Part No E41215 05 December 2014 ...
Page 8: ...viii SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Page 16: ...6 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Front Components ...
Page 18: ...8 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Rear Components ...
Page 21: ...Understanding the Server 11 FIGURE DCU Locations Rear of Server ...
Page 51: ...Preparing the Site 41 ...
Page 82: ...72 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Page 106: ...96 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Page 182: ...172 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...