Connecting the Rear Power Cords and Data Cables
139
1. Confirm that you have completed the following:
■
Cut a hole in the floor to route the power cords and data cables. For
dimensions, see
“Mounting Holes and Cable Routing Floor Cutout
■
Stabilized the server to the installation site – see
.
■
Review the server cable management devices – see
.
■
Confirm that the left cable bracket is installed – see
2. Route the data cables up the server to the cable hooks located above the IOUs.
3. Lead the data cables to the left cable bracket and then down the left cable
channel and down through the bottom of the server.
Summary of Contents for sparc M5-32
Page 1: ...SPARC M5 32 and SPARC M6 32 Servers Installation Guide Part No E41215 05 December 2014 ...
Page 8: ...viii SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Page 16: ...6 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Front Components ...
Page 18: ...8 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Rear Components ...
Page 21: ...Understanding the Server 11 FIGURE DCU Locations Rear of Server ...
Page 51: ...Preparing the Site 41 ...
Page 82: ...72 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Page 106: ...96 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Page 182: ...172 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...