Preparing the Site
53
Preparing the Unloading Route and
Unpacking Area
Use the information in these topics to plan how the server will get from the loading
ramp to the installation site.
■
“Shipping Container Dimensions” on page 54
■
“Loading Dock and Receiving Area Requirements” on page 55
■
“Access Route Guidelines” on page 55
■
Related Information
■
“Reviewing the Physical Specifications” on page 23
■
“Preparing for Installation” on page 67
■
Summary of Contents for sparc M5-32
Page 1: ...SPARC M5 32 and SPARC M6 32 Servers Installation Guide Part No E41215 05 December 2014 ...
Page 8: ...viii SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Page 16: ...6 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Front Components ...
Page 18: ...8 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Rear Components ...
Page 21: ...Understanding the Server 11 FIGURE DCU Locations Rear of Server ...
Page 51: ...Preparing the Site 41 ...
Page 82: ...72 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Page 106: ...96 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Page 182: ...172 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...