SPARC M5-32 and SPARC M6-32 Servers Installation Guide • December 2014
4. Lift the door off the lower hinge pin and set the door aside.
Note –
If you removed the rear door to complete another task, return to that task.
Otherwise, continue to the next step.
5. Continue to one of the following procedures based on whether you will be
routing the SP cables down through the floor or up to cable trays above the
server:
■
“Route the SP Cables Down” on page 102
■
“Route the SP Cables Up” on page 107
Related Information
■
“Move the Server to the Installation Site” on page 79
■
“Install the Door” on page 115
▼
Route the SP Cables Down
When routing the SP cables down through the floor, you must route them through
the front kick plate.
Summary of Contents for sparc M5-32
Page 1: ...SPARC M5 32 and SPARC M6 32 Servers Installation Guide Part No E41215 05 December 2014 ...
Page 8: ...viii SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Page 16: ...6 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Front Components ...
Page 18: ...8 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Rear Components ...
Page 21: ...Understanding the Server 11 FIGURE DCU Locations Rear of Server ...
Page 51: ...Preparing the Site 41 ...
Page 82: ...72 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Page 106: ...96 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Page 182: ...172 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...