132
SPARC M5-32 and SPARC M6-32 Servers Installation Guide • December 2014
2. If you have routed the power cords down the right cable channel and through a
floor cutout, skip to
Otherwise, continue to the next step.
3. Confirm that the power cords have been routed up through the right-most
opening at the top rear of the server.
4. Secure the power cords to a cable tray or similar device above the server.
Refer to the cable tray documentation for instructions. Skip to
.
5. Confirm that the power cords are routed through the right cable channel and
down through the bottom of the server.
6. Confirm that the right cable bracket is installed in the right cable channel.
See
“Prepare the Cable Routing Brackets” on page 123
for instructions.
7. Using tie-wraps, secure the power cords to the right cable bracket and right
channel cable stand-offs.
Ensure that the power cords are routed to the left of the door latch bracket.
Note –
When routing the power cords down the right cable channel, ensure that you
provide enough space for the rear door latch to close without touching a power cord.
Summary of Contents for sparc M5-32
Page 1: ...SPARC M5 32 and SPARC M6 32 Servers Installation Guide Part No E41215 05 December 2014 ...
Page 8: ...viii SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Page 16: ...6 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Front Components ...
Page 18: ...8 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Rear Components ...
Page 21: ...Understanding the Server 11 FIGURE DCU Locations Rear of Server ...
Page 51: ...Preparing the Site 41 ...
Page 82: ...72 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Page 106: ...96 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Page 182: ...172 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...