42
SPARC M5-32 and SPARC M6-32 Servers Installation Guide • December 2014
Related Information
■
“Power Supply Specifications” on page 30
■
“Power Cord Specifications” on page 32
■
“Facility Power Requirements” on page 37
■
“Connect the Power Cords” on page 126
Grounding Requirements
Always connect the cords to grounded power outlets. Computer equipment requires
electrical circuits to be grounded to Earth ground, and connecting the power cords to
grounded outlets completes the server grounding. No additional cabinet grounding
is required.
Because different grounding methods vary by locality, refer to documentation such as
IEC documents for the correct grounding method. Ensure that the facility
administrator or qualified electrical engineer verifies the grounding method for the
building and performs the grounding work.
Related Information
■
“Power Cord Specifications” on page 32
■
“Power Cord-to-Power Supply Relationship” on page 40
Power Supply No.
AC Power Filter No.
AC Power Grid No.
PS0
AC5
AC grid 0
PS1
AC4
AC grid 0
PS2
AC3
AC grid 0
PS3
AC2
AC grid 1
PS4
AC1
AC grid 1
PS5
AC0
AC grid 1
PS6
AC5
AC grid 0
PS7
AC4
AC grid 0
PS8
AC3
AC grid 0
PS9
AC2
AC grid 1
PS10
AC1
AC grid 1
PS11
AC0
AC grid 1
Summary of Contents for sparc M5-32
Page 1: ...SPARC M5 32 and SPARC M6 32 Servers Installation Guide Part No E41215 05 December 2014 ...
Page 8: ...viii SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Page 16: ...6 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Front Components ...
Page 18: ...8 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Rear Components ...
Page 21: ...Understanding the Server 11 FIGURE DCU Locations Rear of Server ...
Page 51: ...Preparing the Site 41 ...
Page 82: ...72 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Page 106: ...96 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Page 182: ...172 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...