76
SPARC M5-32 and SPARC M6-32 Servers Installation Guide • December 2014
▼
Unpack the Server
Note –
Remove the shipping container materials in a conditioned space away from
the final installation site to reduce the amount of airborne particles from entering the
data center.
1. Ensure that you have enough space to unpack the server safely.
See
for more information.
2. Locate the unpacking instructions.
The unpacking instructions are attached to the outside of the shipping package.
3. Follow the unpacking instructions to unpack the server.
4. Save the mounting brackets and the 13-mm bolts that secured the server to the
shipping pallet.
You can use these mounting brackets, the eight 13-mm bolts that secured these
brackets to the server, and eight 17-mm bolts (which you supply) to secure the
server to the installation site floor.
Note –
When unpacking the server, remove the kick plate to access the front
mounting brackets. Use a T20 Torx screwdriver to loosen the three captive screws
securing the kick plate to the server and then remove the kick plate.
Note –
Before rolling the server down the ramps, make sure that the leveling feet are
raised completely. See
“Raise the Leveling Feet” on page 89
for instructions.
Summary of Contents for sparc M5-32
Page 1: ...SPARC M5 32 and SPARC M6 32 Servers Installation Guide Part No E41215 05 December 2014 ...
Page 8: ...viii SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Page 16: ...6 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Front Components ...
Page 18: ...8 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Rear Components ...
Page 21: ...Understanding the Server 11 FIGURE DCU Locations Rear of Server ...
Page 51: ...Preparing the Site 41 ...
Page 82: ...72 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Page 106: ...96 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Page 182: ...172 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...