
Keratron
®
Scout Installation and Operating Manual
OPTIKON 2000
6 INSTALLATION
6.1 INTRODUCTION
This section details a recommended installation procedure for the Keratron
®
Scout
corneal topography system.
Follow the installation and operating instructions carefully in a step by step manner
and, within a short time, you will have gained all the knowledge needed for
successful operation of your Keratron
®
Scout corneal topography system.
6.2 UNPACKING AND INSPECTION
This unit has been packaged to minimize the risk of damage in shipment. Unwrap the
package and examine the components. Handle all components with care during
unpacking. Use caution cutting the wrapping to ensure that the cut does not
penetrate the packing and damage the components. If external or internal shipping
damage is discovered, notify the carrier (mail, railways or forwarding agents) and
Optikon 2000 as soon as possible. Check the contents against the packing list and
notify Optikon 2000 immediately of any discrepancies.
Cod. 161204EN
6-1
2008-12-03 Rev.B