![background image](http://html1.mh-extra.com/html/omron/nsh5/nsh5_operation-manual_744522051.webp)
27
Connecting the Special Cable
Section 2-3
3.
When the cover has been removed and the back of the PT is open, the
I/O connector and interface on the board in the PT can be seen.
4.
Using your hand, lightly tighten the waterproof packing while it is attached
to the housing. Then use a wrench to tighten the waterproof packing to a
force of 4.0 to 6.0 N·m to secure it in place.
5.
Insert the cable into the PT until the heat-shrinking tube is visible on the
inside.
6.
Insert the cable packing into the inside of the cable clamp housing and
lightly tighten the cap by hand.
DIP Switch
Battery interface
Serial interface
External output interface
24-VDC interface
ON
DIP switch pins are ON
when set to the right.
Heat-shrinking tube
Cable packing
Summary of Contents for NSH5
Page 2: ......
Page 4: ...iv ...
Page 12: ...xii ...
Page 16: ...xvi ...
Page 24: ...xxiv EC Directives 6 ...
Page 58: ...34 Installing the Mounting Bracket Section 2 5 ...
Page 86: ...62 Connection Method Section 4 5 ...
Page 92: ...68 Precautions When Replacing the PT Section 5 4 ...
Page 98: ...74 General Specifications Appendix A ...
Page 99: ...75 Appendix B Dimensions 75 50 176 223 75 Four M4 70 5 16 5 ...
Page 102: ...78 Types of Memory Appendix C ...
Page 107: ...83 Recommended Enabling Circuits Appendix D Program Example ...
Page 108: ...84 Recommended Enabling Circuits Appendix D ...